Cattle Drive Solar
ERCOT queue ID 29INR0013
Cattle Drive Solar (29INR0013) is listed in the ERCOT interconnection queue as a 307 MW solar project in Crane County, TX. The filing names North McCamey as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of December 31, 2028. It records the screening study as complete on September 10, 2024 and the interconnection agreement as signed on December 29, 2025.
| Queue ID | 29INR0013 |
|---|---|
| Project name | Cattle Drive Solar |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | North McCamey |
| Point of interconnection | 76000 North McCamey 345kV |
| County | Crane |
| State | TX |
| Voltage | 345 kV |
| Capacity | 307 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-12-31 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Crane, TX: 14 requests in the ERCOT queue, 13 active totaling 2,944.5 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Cattle Drive Solar, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | SOL |
| Technology code | PV |
| Interconnection agreement signed | 2025-12-29 |
| Screening study complete | 2024-09-10 |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.