Cattle Drive Solar

ERCOT queue ID 29INR0013

Cattle Drive Solar (29INR0013) is listed in the ERCOT interconnection queue as a 307 MW solar project in Crane County, TX. The filing names North McCamey as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of December 31, 2028. It records the screening study as complete on September 10, 2024 and the interconnection agreement as signed on December 29, 2025.

Queue ID29INR0013
Project nameCattle Drive Solar
Status (as published)SS Completed, FIS Started, IA
SubstationNorth McCamey
Point of interconnection76000 North McCamey 345kV
CountyCrane
StateTX
Voltage345 kV
Capacity307 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-12-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Crane, TX: 14 requests in the ERCOT queue, 13 active totaling 2,944.5 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityCattle Drive Solar, LLC
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Interconnection agreement signed2025-12-29
Screening study complete2024-09-10
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.