Soda Lake Solar 2 SLF

ERCOT queue ID 23INR0080

Queue ID23INR0080
Project nameSoda Lake Solar 2 SLF
Status (as published)SS Completed, FIS Started, IA
SubstationSoda Lake (#)
Point of interconnection138 kV Soda Lake (#76026)
CountyCrane
StateTX
Voltage138 kV
Capacity201.7 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2027-12-01
Source datasetlarge

Additional filed fields

Interconnecting EntityCrane II Solar Electric, LLC
Cdr ZoneWEST
Fuel CodeSOL
Technology CodePV
Ia Signed44643
Screening Study Complete44165
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.