Western Flats Solar
ERCOT queue ID 26INR0110
Western Flats Solar (26INR0110) is listed in the ERCOT interconnection queue as a 410.2 MW solar project in Crane County, TX. The filing names Tap Crane - King Mountain; POI is 7.85 miles from Crane. as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of November 1, 2028. It records the screening study as complete on July 5, 2023.
| Queue ID | 26INR0110 |
|---|---|
| Project name | Western Flats Solar |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap Crane - King Mountain; POI is 7.85 miles from Crane. |
| Point of interconnection | Tap 138 kV 76615 Crane -76635 King Mountain; POI is 7.85 miles from Crane. |
| County | Crane |
| State | TX |
| Voltage | 138 kV |
| Capacity | 410.2 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-11-01 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Crane, TX: 14 requests in the ERCOT queue, 13 active totaling 2,944.5 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Hecate Energy Point Mountain Solar Facility 1 LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2023-07-05 |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.