Western Flats Solar

ERCOT queue ID 26INR0110

Western Flats Solar (26INR0110) is listed in the ERCOT interconnection queue as a 410.2 MW solar project in Crane County, TX. The filing names Tap Crane - King Mountain; POI is 7.85 miles from Crane. as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of November 1, 2028. It records the screening study as complete on July 5, 2023.

Queue ID26INR0110
Project nameWestern Flats Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Crane - King Mountain; POI is 7.85 miles from Crane.
Point of interconnectionTap 138 kV 76615 Crane -76635 King Mountain; POI is 7.85 miles from Crane.
CountyCrane
StateTX
Voltage138 kV
Capacity410.2 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-11-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Crane, TX: 14 requests in the ERCOT queue, 13 active totaling 2,944.5 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityHecate Energy Point Mountain Solar Facility 1 LLC
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Screening study complete2023-07-05
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first