ERCOT queue ID 23INR0308

Fowler Ranch Storage (23INR0308) is listed in the ERCOT interconnection queue as a 26.1 MW battery project in Crane County, TX. The filing names Castle Mountain as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 30, 2027. It records the screening study as complete on September 7, 2021.

Queue ID23INR0308
Project nameFowler Ranch Storage
Status (as published)SS Completed, FIS Started, No IA
SubstationCastle Mountain
Point of interconnection76025 Castle Mountain 138kV
CountyCrane
StateTX
Voltage138 kV
Capacity26.1 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2027-09-30
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Crane, TX: 14 requests in the ERCOT queue, 13 active totaling 2,944.5 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityCrane BESS, LLC
CDR reporting zoneWEST
Fuel codeOTH
Technology codeBA
Screening study complete2021-09-07

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.