Crook, OR interconnection queue
5 active projects totalling 2,500 MW in the BPA queue, plus 17 with terminal status (shown greyed).
5active projects
2,500active MW
22total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G1053 | Not reported | 500 | 1,300 | Battery | WITHDRAWN |
| G0695 | Not reported | 500 | 1,200 | Battery | WITHDRAWN |
| G0696 | Not reported | 500 | 1,200 | Solar | WITHDRAWN |
| G0663 | Not reported | 500 | 700 | Solar | WITHDRAWN |
| G0306 | Not reported | n/r | 600 | Wind | WITHDRAWN |
| G0642 | Not reported | 230 | 600 | Battery | STUDY |
| G0643 | Not reported | 230 | 600 | Battery | STUDY |
| G0669 | Not reported | 230 | 600 | Solar | STUDY |
| G0673 | Not reported | 500 | 600 | Solar | WITHDRAWN |
| G0674 | Not reported | 500 | 600 | Solar | WITHDRAWN |
| G0675 | Not reported | 500 | 600 | Hydro | STUDY |
| G0698 | Not reported | 500 | 600 | Solar | WITHDRAWN |
| G0699 | Not reported | 500 | 600 | Battery | WITHDRAWN |
| G0700 | Not reported | 500 | 600 | Solar | WITHDRAWN |
| G0701 | Not reported | 500 | 600 | Solar | WITHDRAWN |
| G0702 | Not reported | 500 | 600 | Solar | WITHDRAWN |
| G0977 | Not reported | n/r | 200 | Battery | WITHDRAWN |
| G0300 | Not reported | 115 | 104 | Wind | WITHDRAWN |
| G0551 | Not reported | n/r | 101 | Solar | WITHDRAWN |
| G0693 | Not reported | 500 | 100 | Hydro | STUDY |
| G0694 | Not reported | 500 | 100 | Solar | WITHDRAWN |
| G0577 | Not reported | n/r | 40 | Solar | WITHDRAWN |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.