Outback
BPA queue ID G0377
| Queue ID | G0377 |
|---|---|
| Project name | Outback |
| Status (as published) | ENERGIZED |
| Substation | Midstate Electric distribution system |
| Point of interconnection | Midstate Electric 24.9 kV distribution system |
| County | Lake |
| State | OR |
| Voltage | 24.9 kV |
| Capacity | 4 MW |
| Resource (as published) | Solar/Photovoltaic |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2010-07-30 |
| Source dataset | bpa-generation |
Tracked changes
No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →
Additional filed fields
| Requestor | Outback Solar, LLC |
|---|---|
| Connection Type | GI |
| Interconnection Type | ERIS |
| Poi | Midstate Electric 24.9 kV distribution system |
| Generator Type | Photovoltaic |
| Fuel Source | Solar |
| Nameplate Mw Total | 4 |
| Max Summer Mw | 4 |
| Max Winter Mw | 4 |
| Reason Not Completed | . |
| Comments | Integration; on-line November 2012 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.