Easton-Trappe Tap substation interconnection queue

1 active project totalling 63 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
63active MW
2total filed
Queue IDProjectkVMWResourceStatus
Y3-082 Easton-Trappe Tap 69kV 69 63 Not reported In Service
Z2-050 Easton-Trappe Tap 69kV 69 13 Not reported Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.