Substation Scout

Wye Mills Solar Site

PJM queue ID Y1-079

Wye Mills Solar Site (Y1-079) is listed in the PJM interconnection queue as a 3.8 MW solar project in Talbot County, MD. The filing names Wye Mills as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of July 29, 2016.

Queue IDY1-079
Project nameWye Mills Solar Site
Status (as published)In Service
SubstationWye Mills
Point of interconnectionWye Mills 69kV
CountyTalbot
StateMD
Voltage69 kV
Capacity3.8 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2016-07-29
Source datasetserial

Same substation and county

Wye Mills substation: 5 requests in the PJM queue, 1 active totaling 3.8 MW.

Queue IDProjectMWResourceStatus
AB2-185Wye Mills 25kV5.6SolarWithdrawn
Y1-081Wye Mills 12kV1.3SolarWithdrawn
AC1-224Wye Mills 25kV0BatteryWithdrawn
AE1-048Wye Mills 25 kV0BatteryWithdrawn

Talbot, MD: 16 requests in the PJM queue, 6 active totaling 269.8 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy10
MW capacity3.8
MFO10

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.