Tucker, WV interconnection queue
3 active projects totalling 94.7 MW in the PJM queue, plus 7 with terminal status (shown greyed).
3active projects
94.7active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI2-445 | Parsons - William 138 kV | 138 | 128.8 | Hybrid | Withdrawn |
| C01-1733 | William 138 kV | 138 | 58.7 | Wind | Active |
| AH1-369 | Backbone Mountain 138 kV II | 138 | 40 | Battery | Withdrawn |
| AD2-126 | Backbone Mountain 138 kV | 138 | 18 | Battery | Withdrawn |
| B28_W07 | Backbone WF | 138 | 18 | Wind | In Service |
| K19 | Backbone WF | 138 | 18 | Wind | In Service |
| AE1-052 | Backbone Mountain Windpower | 138 | 10 | Battery | Withdrawn |
| AG1-112 | William 138 kV | 138 | 10 | Battery | Withdrawn |
| AH2-040 | William - Blackwater 69 kV | 69 | 5.8 | Solar | Withdrawn |
| AA2-103 | Backbone Mountain Energy Storage | 138 | 0 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.