Tucker, WV interconnection queue

3 active projects totalling 94.7 MW in the PJM queue, plus 7 with terminal status (shown greyed).

3active projects
94.7active MW
10total filed
Queue IDProjectkVMWResourceStatus
AI2-445 Parsons - William 138 kV 138 128.8 Hybrid Withdrawn
C01-1733 William 138 kV 138 58.7 Wind Active
AH1-369 Backbone Mountain 138 kV II 138 40 Battery Withdrawn
AD2-126 Backbone Mountain 138 kV 138 18 Battery Withdrawn
B28_W07 Backbone WF 138 18 Wind In Service
K19 Backbone WF 138 18 Wind In Service
AE1-052 Backbone Mountain Windpower 138 10 Battery Withdrawn
AG1-112 William 138 kV 138 10 Battery Withdrawn
AH2-040 William - Blackwater 69 kV 69 5.8 Solar Withdrawn
AA2-103 Backbone Mountain Energy Storage 138 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.