Backbone Mountain substation interconnection queue

2 active projects totalling 36 MW in the PJM queue, plus 2 with terminal status (shown greyed).

2active projects
36active MW
4total filed
Queue IDProjectkVMWResourceStatus
AD2-126 Backbone Mountain 138 kV 138 18 Battery Withdrawn
B28_W07 Backbone WF 138 18 Wind In Service
K19 Backbone WF 138 18 Wind In Service
AA2-103 Backbone Mountain Energy Storage 138 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.