Utica Junction 115 kV
PJM queue ID C01-1545
Utica Junction 115 kV (C01-1545) is listed in the PJM interconnection queue as a 110 MW hybrid project in Venango County, PA. The filing names Utica Junction as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 1, 2030.
| Queue ID | C01-1545 |
|---|---|
| Project name | Utica Junction 115 kV |
| Status (as published) | Active |
| Substation | Utica Junction |
| Point of interconnection | Utica Junction 115 kV |
| County | Venango |
| State | PA |
| Voltage | 115 kV |
| Capacity | 110 MW |
| Resource (as published) | Solar,Storage,Hybrid |
| Resource category | Hybrid (normalized for filtering) |
| Target commercial operation | 2030-06-01 |
| Source dataset | cycle |
Same substation and county
Utica Junction substation: 2 requests in the PJM queue, 1 active totaling 110 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AG1-193 | Foster Run | 6 | Solar | Withdrawn |
Venango, PA: 36 requests in the PJM queue, 6 active totaling 871.3 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Sleepy Hollow Generating, LLC |
|---|---|
| Transmission owner | PENELEC |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 110.0 |
| MW capacity | 110.0 |
| MFO | 110.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/24/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.