Gates, NC interconnection queue

4 active projects totalling 661 MW in the PJM queue, plus 5 with terminal status (shown greyed).

4active projects
661active MW
9total filed
Queue IDProjectkVMWResourceStatus
C01-1499 Suffolk - Nucor Tap 230 kV 230 375 Hybrid Active
C01-2144 Suffolk - Nucor Tap 230 kV 230 166 Hybrid Active
C01-1804 Sunbury - Swamp 230 kV 230 75 Solar Active
AA1-134 Sunbury-WinFall 230kV 230 56 Solar Withdrawn
AA1-138 Haslett Solar Park 230 56 Solar Withdrawn
AA2-175 Suffolk-Sunbury 230kV 230 56 Solar Withdrawn
AF2-073 Nucor Steel-Suffolk 230 kV 230 54.9 Solar Withdrawn
C01-1255 Suffolk - Sunbury 230 kV 230 45 Solar Active
AF2-074 Nucor Steel-Suffolk 230 kV 230 24.4 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.