Nucor Steel-Suffolk substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF2-073 | Nucor Steel-Suffolk 230 kV | 230 | 54.9 | Solar | Withdrawn |
| AF2-074 | Nucor Steel-Suffolk 230 kV | 230 | 24.4 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.