Substation Scout

Patton Wind Farm

PJM queue ID Z2-014

Patton Wind Farm (Z2-014) is listed in the PJM interconnection queue as a 1.4 MW wind project in Cambria County, PA. The filing names St. Benedict-Patton as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2015.

Queue IDZ2-014
Project namePatton Wind Farm
Status (as published)In Service
SubstationSt. Benedict-Patton
Point of interconnectionSt. Benedict-Patton
CountyCambria
StatePA
VoltageNot reported
Capacity1.4 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2015-12-31
Source datasetserial

Same substation and county

St. Benedict-Patton substation: 2 requests in the PJM queue, 2 active totaling 5.4 MW.

Queue IDProjectMWResourceStatus
V3-030Patton Wind Farm4WindIn Service

Cambria, PA: 46 requests in the PJM queue, 13 active totaling 1,643.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy0
MW capacity1.35
MFO30.6

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first