Substation Scout

Southwest Lima-West Moulton substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
AF1-085 Southwest Lima-West Moulton 138 kV 138 32.3 Solar Withdrawn
X3-031 Southwest Lima-West Moulton 138kV 138 19.5 Wind Withdrawn
AF2-059 Southwest Lima-West Moulton 138 kV 138 8.4 Solar Withdrawn
AG1-025 Southwest Lima-West Moulton 138 kV 138 8.4 Solar Withdrawn
AG2-033 Southwest Lima-West Moulton 138 kV 138 8.4 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.