Solidago Solar

PJM queue ID AE1-162

Solidago Solar (AE1-162) is listed in the PJM interconnection queue as a 12 MW solar project in Isle of Wight County, VA. The filing names Smithfield as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2023.

Queue IDAE1-162
Project nameSolidago Solar
Status (as published)In Service
SubstationSmithfield
Point of interconnectionSmithfield 34.5 kV
CountyIsle of Wight
StateVA
Voltage34.5 kV
Capacity12 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2023-12-31
Source datasetserial

Same substation and county

Smithfield substation: 3 requests in the PJM queue, 1 active totaling 12 MW.

Queue IDProjectMWResourceStatus
AG2-350Smithfield 230 kV100BatteryWithdrawn
AC2-161Solidago13.2SolarWithdrawn

Isle of Wight, VA: 25 requests in the PJM queue, 9 active totaling 444.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy20
MW capacity12
MFO20

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.