Hebron Solar
PJM queue ID AF1-258
Hebron Solar (AF1-258) is listed in the PJM interconnection queue as a 3.2 MW solar project in Wicomico County, MD. The filing names Rockawalkin as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of September 1, 2023.
| Queue ID | AF1-258 |
|---|---|
| Project name | Hebron Solar |
| Status (as published) | In Service |
| Substation | Rockawalkin |
| Point of interconnection | Rockawalkin 69 kV |
| County | Wicomico |
| State | MD |
| Voltage | 69 kV |
| Capacity | 3.2 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2023-09-01 |
| Source dataset | serial |
Same substation and county
Rockawalkin substation: 4 requests in the PJM queue, 2 active totaling 8.9 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| Y3-058 | Rockfish Solar Power Plant | 5.7 | Solar | In Service |
| AB2-180 | Hebron Solar | 14 | Solar | Withdrawn |
| AI2-207 | Rockawalkin 69 kV | 5.4 | Solar | Withdrawn |
Wicomico, MD: 34 requests in the PJM queue, 6 active totaling 149 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 0 |
| MW capacity | 3.2 |
| MFO | 15 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.