Ripley Solar
PJM queue ID AC2-120
Ripley Solar (AC2-120) is listed in the PJM interconnection queue as a 10.5 MW solar project in Charles County, MD. The filing names Ripley as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of July 13, 2022.
| Queue ID | AC2-120 |
|---|---|
| Project name | Ripley Solar |
| Status (as published) | In Service |
| Substation | Ripley |
| Point of interconnection | Ripley 69kV |
| County | Charles |
| State | MD |
| Voltage | 69 kV |
| Capacity | 10.5 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2022-07-13 |
| Source dataset | serial |
Same substation and county
Ripley substation: 2 requests in the PJM queue, 1 active totaling 10.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AC2-013 | Ripley 69kV | 0 | Solar | Withdrawn |
Charles, MD: 50 requests in the PJM queue, 12 active totaling 1,900.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 27.5 |
| MW capacity | 10.45 |
| MFO | 27.5 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.