0 active projects
totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).
0active projects
0active MW
4total filed
Queue ID
Project
kV
MW
Resource
Status
C01-1049
Pigeon Creek - Ragland 138 kV
138
96
Hybrid
Withdrawn
AH1-188
Pigeon Creek 138 kV
138
84
Solar
Withdrawn
AG2-354
Ragland - Grant Branch 138 kV
138
72.9
Hybrid
Withdrawn
V4-059
Pine Creek 46kV
46
20
Other
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with PJM before relying on these figures.
Site Scanner
Before you spend weeks on a site, spend seconds screening it.