Edison-Gravel Pit substation interconnection queue

1 active project totaling 90 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Edison-Gravel Pit as the point of interconnection, all in St. Joseph County, IN.

Target commercial operation dates as filed run from Jan 2025 to Dec 2025 (2 filings).

1active projects
90active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AF1-158 Honeysuckle Solar Project 138 90 Solar In Service Jan 2025
AI2-291 Edison-Gravel Pit 138 kV 138 10.5 Solar Withdrawn Dec 2025

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.