Edison-Gravel Pit substation interconnection queue

1 active project totalling 90 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
90active MW
2total filed
Queue IDProjectkVMWResourceStatus
AF1-158 Honeysuckle Solar Project 138 90 Solar In Service
AI2-291 Edison-Gravel Pit 138 kV 138 10.5 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.