Dumont-Olive substation interconnection queue
2 active projects totaling 715 MW in the PJM queue.
2 PJM queue filings name Dumont-Olive as the point of interconnection, all in St. Joseph County, IN.
Target commercial operation date as filed: Apr 2018 (2 filings).
2active projects
715active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| X2-052 | St. Joseph Energy Center, LLC | 345 | 675 | Gas | In Service | Apr 2018 |
| AB1-080 | St. Joseph's Energy Center, LLC | 345 | 40 | Gas | In Service | Apr 2018 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in St. Joseph County, IN
- Dumont: 3 active, 320 MW of 7 filed
- Edison-Gravel Pit: 1 active, 90 MW of 2 filed
- Olive: 1 active, 2.5 MW of 2 filed
- Dumont-Stillwell: none active of 3 filed
- Elderberry-Dumont: none active of 2 filed
- New Carlisle: none active of 2 filed
- Olive - Dumont: none active of 2 filed
- Olive-Dumont: none active of 2 filed