Elderberry-Dumont substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE1-089 | Elderberry-Dumont 345 kV | 345 | 130.7 | Solar | Withdrawn |
| AE2-008 | Elderberry-Dumont 345 kV | 345 | 80 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.