Dumont-Stillwell substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name Dumont-Stillwell as the point of interconnection, all in St. Joseph County, IN.
Target commercial operation dates as filed run from Jun 2020 to Jun 2023 (2 filings).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AD2-080 | Dumont-Stillwell 345kV | 345 | 309 | Not reported | Withdrawn | Jun 2020 |
| AD2-054 | Dumont-Stillwell 345kV | 345 | 50 | Not reported | Withdrawn | n/r |
| AF2-320 | Dumont-Stillwell 345 kV | 345 | 48 | Not reported | Withdrawn | Jun 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in St. Joseph County, IN
- Dumont-Olive: 2 active, 715 MW of 2 filed
- Dumont: 3 active, 320 MW of 7 filed
- Edison-Gravel Pit: 1 active, 90 MW of 2 filed
- Olive: 1 active, 2.5 MW of 2 filed
- Elderberry-Dumont: none active of 2 filed
- New Carlisle: none active of 2 filed
- Olive - Dumont: none active of 2 filed
- Olive-Dumont: none active of 2 filed