New Carlisle substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name New Carlisle as the point of interconnection, all in St. Joseph County, IN.

Target commercial operation dates as filed run from Jun 2023 to Sep 2023 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AH1-479 New Carlisle 138 kV 138 82 Battery Withdrawn Sep 2023
AF2-191 New Carlisle 138 kV 138 66 Solar Withdrawn Jun 2023

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “New Carlisle” in IN. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.

Other PJM queue substations in St. Joseph County, IN

All 33 PJM queue filings in St. Joseph County, IN.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first