Substation Scout

Knoxville Solar

PJM queue ID AE2-247

Knoxville Solar (AE2-247) is listed in the PJM interconnection queue as a 8.4 MW solar project in Isle of Wight County, VA. The filing names Myrtle-Windsor as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of December 1, 2027.

Queue IDAE2-247
Project nameKnoxville Solar
Status (as published)Engineering and Procurement
SubstationMyrtle-Windsor
Point of interconnectionMyrtle-Windsor 115 kV
CountyIsle of Wight
StateVA
Voltage115 kV
Capacity8.4 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-12-01
Source datasetserial

Same substation and county

Myrtle-Windsor substation: 4 requests in the PJM queue, 2 active totaling 16 MW.

Queue IDProjectMWResourceStatus
AF1-017Knoxville Solar7.6SolarEngineering and Procurement
AI2-078Myrtle-Windsor 115 kV52.7SolarWithdrawn
AB2-149Myrtle-Windsor 115kV19SolarWithdrawn

Isle of Wight, VA: 25 requests in the PJM queue, 9 active totaling 444.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy20
MW capacity8.4
MFO71

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first