Albright substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
Target commercial operation dates as filed run from Dec 2012 to Jun 2017 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| Z1-047 | Albright | n/r | 464 | Gas | Withdrawn | Jun 2017 |
| P52 | Albright 138kV | 138 | 16 | Wind | Withdrawn | Dec 2012 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Mifflin County, PA
- Belleville: none active of 2 filed
Other PJM queue substations in Preston County, WV
- North Longview: 2 active, 1,245 MW of 4 filed
- Mount Storm - Pruntytown: 2 active, 231 MW of 2 filed
- Afton: none active of 2 filed
- Garrett - Albright: none active of 2 filed
- Horse Shoe Run: none active of 2 filed