Substation Scout

Blue Creek Wind Farm

PJM queue ID AE1-102

Blue Creek Wind Farm (AE1-102) is listed in the PJM interconnection queue as a 15.6 MW solar project in Van Wert County, OH. The filing names Maddox Creek as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of September 9, 2027.

Queue IDAE1-102
Project nameBlue Creek Wind Farm
Status (as published)Engineering and Procurement
SubstationMaddox Creek
Point of interconnectionMaddox Creek 345 kV
CountyVan Wert
StateOH
Voltage345 kV
Capacity15.6 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-09-09
Source datasetserial

Same substation and county

Maddox Creek substation: 4 requests in the PJM queue, 3 active totaling 113.2 MW.

Queue IDProjectMWResourceStatus
AF2-014Wild Grains Solar90SolarUnder Construction
AC2-044Blue Creek Wind Farm7.6SolarEngineering and Procurement
AB2-016Maddox Creek 345kV13WindWithdrawn

Van Wert, OH: 26 requests in the PJM queue, 6 active totaling 463.2 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy26
MW capacity15.6
MFO396

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first