Pine Glade Solar

PJM queue ID AE2-134

Pine Glade Solar (AE2-134) is listed in the PJM interconnection queue as a 16.5 MW solar project in Orange County, VA. The filing names Locust Grove-Paytes as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of July 15, 2024.

Queue IDAE2-134
Project namePine Glade Solar
Status (as published)In Service
SubstationLocust Grove-Paytes
Point of interconnectionLocust Grove-Paytes 115 kV
CountyOrange
StateVA
Voltage115 kV
Capacity16.5 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2024-07-15
Source datasetserial

Same substation and county

Locust Grove-Paytes substation: 3 requests in the PJM queue, 2 active totaling 40.3 MW.

Queue IDProjectMWResourceStatus
AC1-076Pine Glade Solar23.8SolarIn Service
AE1-010Locust Grove-Paytes 115 kV33BatteryWithdrawn

Orange, VA: 23 requests in the PJM queue, 4 active totaling 193.3 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy0
MW capacity16.5
MFO62.5

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.