Pine Glade Solar
PJM queue ID AC1-076
Pine Glade Solar (AC1-076) is listed in the PJM interconnection queue as a 23.8 MW solar project in Orange County, VA. The filing names Locust Grove-Paytes as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of July 15, 2024.
| Queue ID | AC1-076 |
|---|---|
| Project name | Pine Glade Solar |
| Status (as published) | In Service |
| Substation | Locust Grove-Paytes |
| Point of interconnection | Locust Grove-Paytes 115kV |
| County | Orange |
| State | VA |
| Voltage | 115 kV |
| Capacity | 23.8 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2024-07-15 |
| Source dataset | serial |
Same substation and county
Locust Grove-Paytes substation: 3 requests in the PJM queue, 2 active totaling 40.3 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AE2-134 | Pine Glade Solar | 16.5 | Solar | In Service |
| AE1-010 | Locust Grove-Paytes 115 kV | 33 | Battery | Withdrawn |
Orange, VA: 23 requests in the PJM queue, 4 active totaling 193.3 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 62.5 |
| MW capacity | 23.8 |
| MFO | 62.5 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.