JoDaviess, IL interconnection queue
1 active project totalling 20 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
20active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| P46 | EcoGrove WF (67 WT) | 138 | 20 | Wind | In Service |
| O30 | Nora | n/r | 9 | Wind | Withdrawn |
| O47 | Nora | n/r | 2 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.