High Point II Solar
PJM queue ID AE2-035
High Point II Solar (AE2-035) is listed in the PJM interconnection queue as a 21 MW solar project in Stephenson County, IL. The filing names Lena as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of February 28, 2024.
| Queue ID | AE2-035 |
|---|---|
| Project name | High Point II Solar |
| Status (as published) | In Service |
| Substation | Lena |
| Point of interconnection | Lena 138 kV |
| County | Stephenson |
| State | IL |
| Voltage | 138 kV |
| Capacity | 21 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2024-02-28 |
| Source dataset | serial |
Same substation and county
Lena substation: 7 requests in the PJM queue, 3 active totaling 62 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AD2-172 | High Point Solar | 21 | Solar | In Service |
| P46 | EcoGrove WF (67 WT) | 20 | Wind | In Service |
| AH1-354 | Lena 138 kV | 40 | Battery | Withdrawn |
| R16 | Lena 138kV | 25.2 | Wind | Withdrawn |
| AH1-353 | Lena 138 kV | 12 | Solar | Withdrawn |
| AF1-060 | Lena 138 kV | 10.3 | Battery | Withdrawn |
Stephenson, IL: 26 requests in the PJM queue, 3 active totaling 56.4 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 50 |
| MW capacity | 21 |
| MFO | 100 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.