High Point II Solar

PJM queue ID AE2-035

High Point II Solar (AE2-035) is listed in the PJM interconnection queue as a 21 MW solar project in Stephenson County, IL. The filing names Lena as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of February 28, 2024.

Queue IDAE2-035
Project nameHigh Point II Solar
Status (as published)In Service
SubstationLena
Point of interconnectionLena 138 kV
CountyStephenson
StateIL
Voltage138 kV
Capacity21 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2024-02-28
Source datasetserial

Same substation and county

Lena substation: 7 requests in the PJM queue, 3 active totaling 62 MW.

Queue IDProjectMWResourceStatus
AD2-172High Point Solar21SolarIn Service
P46EcoGrove WF (67 WT)20WindIn Service
AH1-354Lena 138 kV40BatteryWithdrawn
R16Lena 138kV25.2WindWithdrawn
AH1-353Lena 138 kV12SolarWithdrawn
AF1-060Lena 138 kV10.3BatteryWithdrawn

Stephenson, IL: 26 requests in the PJM queue, 3 active totaling 56.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy50
MW capacity21
MFO100

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.