EcoGrove WF (67 WT)

PJM queue ID P46

EcoGrove WF (67 WT) (P46) is listed in the PJM interconnection queue as a 20 MW wind project in JoDaviess County, IL. The filing names Lena as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of March 11, 2009.

Queue IDP46
Project nameEcoGrove WF (67 WT)
Status (as published)In Service
SubstationLena
Point of interconnectionLena 138kV
CountyJoDaviess
StateIL
Voltage138 kV
Capacity20 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2009-03-11
Source datasetserial

Same substation and county

Lena substation: 7 requests in the PJM queue, 3 active totaling 62 MW.

Queue IDProjectMWResourceStatus
AD2-172High Point Solar21SolarIn Service
AE2-035High Point II Solar21SolarIn Service
AH1-354Lena 138 kV40BatteryWithdrawn
R16Lena 138kV25.2WindWithdrawn
AH1-353Lena 138 kV12SolarWithdrawn
AF1-060Lena 138 kV10.3BatteryWithdrawn

JoDaviess, IL: 3 requests in the PJM queue, 1 active totaling 20 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy100
MW capacity20
MFO100

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.