EcoGrove WF (67 WT)
PJM queue ID P46
EcoGrove WF (67 WT) (P46) is listed in the PJM interconnection queue as a 20 MW wind project in JoDaviess County, IL. The filing names Lena as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of March 11, 2009.
| Queue ID | P46 |
|---|---|
| Project name | EcoGrove WF (67 WT) |
| Status (as published) | In Service |
| Substation | Lena |
| Point of interconnection | Lena 138kV |
| County | JoDaviess |
| State | IL |
| Voltage | 138 kV |
| Capacity | 20 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2009-03-11 |
| Source dataset | serial |
Same substation and county
Lena substation: 7 requests in the PJM queue, 3 active totaling 62 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AD2-172 | High Point Solar | 21 | Solar | In Service |
| AE2-035 | High Point II Solar | 21 | Solar | In Service |
| AH1-354 | Lena 138 kV | 40 | Battery | Withdrawn |
| R16 | Lena 138kV | 25.2 | Wind | Withdrawn |
| AH1-353 | Lena 138 kV | 12 | Solar | Withdrawn |
| AF1-060 | Lena 138 kV | 10.3 | Battery | Withdrawn |
JoDaviess, IL: 3 requests in the PJM queue, 1 active totaling 20 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 100 |
| MW capacity | 20 |
| MFO | 100 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.