Steele substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Steele as the point of interconnection, all in Caroline County, MD.
Target commercial operation dates as filed run from Dec 2015 to Dec 2018 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AB2-142 | Steele 25kV | 25 | 5.1 | Solar | Withdrawn | Dec 2018 |
| AA2-021 | Steele 25kV | 25 | 2.7 | Solar | Withdrawn | Dec 2015 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Caroline County, MD
- Keeney-Steele: 1 active, 55.1 MW of 3 filed
Site Scanner