Caroline, MD interconnection queue

3 active projects totalling 490 MW in the PJM queue, plus 15 with terminal status (shown greyed).

3active projects
490active MW
18total filed
Queue IDProjectkVMWResourceStatus
AD2-004 Steel-Vienna 230 kV 230 600 Gas Withdrawn
C01-1772 AB2-037 - Steele 230 kV 230 400 Battery Active
AI2-260 Keeney - Steele 230 kV 230 82.1 Solar Withdrawn
AA2-152 Keeney-Steel 230kV 230 56 Solar Withdrawn
AB2-037 Cherrywood Solar I 230 55.1 Solar Partially in Service - Under Construction
AB2-036 Waypost Solar Project 138 34.9 Solar Suspended
AG2-381 Church - Oil City 138 kV II 138 20 Battery Withdrawn
AG2-419 3 Bridges Rd 34.5 kV 34.5 20 Hybrid Withdrawn
Z2-052 Preston-Tanyard 69kV 69 20 Not reported Withdrawn
AH2-370 Church - Oil City 138 kV III 138 17.8 Solar Withdrawn
AB2-142 Steele 25kV 25 5.1 Solar Withdrawn
AA2-021 Steele 25kV 25 2.7 Solar Withdrawn
AA1-127 Andersontown Road 25kV 25 2.3 Solar Withdrawn
AA2-037 Preston 12kV 12 1.9 Solar Withdrawn
AA1-020 Andersontown Road #2 n/r 0 Solar Withdrawn
AA1-021 Andersontown Rd #2 n/r 0 Solar Withdrawn
AA1-022 Andersontown Rd #3 n/r 0 Solar Withdrawn
AA1-023 Andersontown Rd #4 n/r 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.