Cherrywood Solar I
PJM queue ID AB2-037
Cherrywood Solar I (AB2-037) is listed in the PJM interconnection queue as a 55.1 MW solar project in Caroline County, MD. The filing names Keeney-Steele as its point of interconnection. PJM lists its status as “Partially in Service - Under Construction”, with a target commercial operation date of September 1, 2026.
| Queue ID | AB2-037 |
|---|---|
| Project name | Cherrywood Solar I |
| Status (as published) | Partially in Service - Under Construction |
| Substation | Keeney-Steele |
| Point of interconnection | Keeney-Steele 230kV |
| County | Caroline |
| State | MD |
| Voltage | 230 kV |
| Capacity | 55.1 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2026-09-01 |
| Source dataset | serial |
Same substation and county
Keeney-Steele substation: 3 requests in the PJM queue, 1 active totaling 55.1 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF2-360 | Keeney-Steele 230 kV | 75 | Solar | Withdrawn |
| G00_MTX2B | Keeney-Steele 230kV | 0 | Not reported | Withdrawn |
Caroline, MD: 18 requests in the PJM queue, 3 active totaling 490 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 145 |
| MW capacity | 55.1 |
| MFO | 145 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.