Home / PJM / substation / Kanawha River
Kanawha River substation interconnection queue
1 active project
totalling 30 MW in the PJM queue, plus 3 with terminal status (shown greyed).
1 active projects
30 active MW
4 total filed
Queue ID Project kV MW Resource Status
AE2-158
Kanawha River 138 kV
138
48
Hydro
Withdrawn
AE2-160
Hawks Nest Hydro
138
30
Hydro
Engineering and Procurement
W3-161
Kanawha River 138kV
138
13
Other
Withdrawn
AE2-159
Kanawha River 138 kV
138
0
Hydro
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with PJM before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.