Kanawha River substation interconnection queue
1 active project totalling 30 MW in the PJM queue, plus 3 with terminal status (shown greyed).
1active projects
30active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE2-158 | Kanawha River 138 kV | 138 | 48 | Hydro | Withdrawn |
| AE2-160 | Hawks Nest Hydro | 138 | 30 | Hydro | Engineering and Procurement |
| W3-161 | Kanawha River 138kV | 138 | 13 | Other | Withdrawn |
| AE2-159 | Kanawha River 138 kV | 138 | 0 | Hydro | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.