Nuttall substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Nuttall as the point of interconnection, all in Fayette County, WV.
Target commercial operation dates as filed run from Dec 2023 to Dec 2025 (2 filings).
Transmission owner as filed: AEP (1 filing).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-194 | Nuttall 138 kV | 138 | 27 | Hybrid | Withdrawn | Dec 2023 |
| AH2-369 | Nuttall 138 kV | 138 | 16 | Solar | Withdrawn | Dec 2025 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Fayette County, WV
- Kanawha River - Carbondale: 2 active, 117.8 MW of 3 filed
- Kanawha River: 1 active, 30 MW of 4 filed
- Kanawha: 1 active, 5.5 MW of 3 filed
- Carbondale: none active of 2 filed
- Layland: none active of 2 filed