Kanawha substation interconnection queue
1 active project totalling 5.5 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
5.5active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| O57 | Kanawha 138kV | 138 | 142 | Hydro | Withdrawn |
| V1-035 | ST | 138 | 53 | Other | Withdrawn |
| R76 | Hawks Nest Hydro | 138 | 5.5 | Hydro | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.