Kanawha substation interconnection queue

1 active project totalling 5.5 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
5.5active MW
3total filed
Queue IDProjectkVMWResourceStatus
O57 Kanawha 138kV 138 142 Hydro Withdrawn
V1-035 ST 138 53 Other Withdrawn
R76 Hawks Nest Hydro 138 5.5 Hydro In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.