Substation Scout

Kanawha River - Carbondale 138 kV

PJM queue ID C01-1282

Kanawha River - Carbondale 138 kV (C01-1282) is listed in the PJM interconnection queue as a 80 MW battery project in Fayette County, WV. The filing names Kanawha River - Carbondale as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of November 15, 2028.

Queue IDC01-1282
Project nameKanawha River - Carbondale 138 kV
Status (as published)Active
SubstationKanawha River - Carbondale
Point of interconnectionKanawha River - Carbondale 138 kV
CountyFayette
StateWV
Voltage138 kV
Capacity80 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-11-15
Source datasetcycle

Same substation and county

Kanawha River - Carbondale substation: 3 requests in the PJM queue, 2 active totaling 117.8 MW.

Queue IDProjectMWResourceStatus
AG2-657Kanawha River - Carbondale 138 kV37.8SolarActive
AG2-656Kanawha River - Carbondale 138 kV60SolarWithdrawn

Fayette, WV: 15 requests in the PJM queue, 4 active totaling 153.3 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperMammoth Solar, LLC
Transmission ownerAEP
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy30.0
MW capacity80.0
MFO120.0
Submitted date4/27/2026
Last updated6/22/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.