Fayette, WV interconnection queue
4 active projects totalling 153.3 MW in the PJM queue, plus 11 with terminal status (shown greyed).
4active projects
153.3active MW
15total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| O57 | Kanawha 138kV | 138 | 142 | Hydro | Withdrawn |
| C01-1282 | Kanawha River - Carbondale 138 kV | 138 | 80 | Battery | Active |
| V1-035 | ST | 138 | 53 | Other | Withdrawn |
| AE2-158 | Kanawha River 138 kV | 138 | 48 | Hydro | Withdrawn |
| AI2-190 | Carbondale 138 kV | 138 | 40.2 | Solar | Withdrawn |
| AG1-219 | Layland 69 kV | 69 | 39.5 | Hybrid | Withdrawn |
| AG2-657 | Kanawha River - Carbondale 138 kV | 138 | 37.8 | Solar | Active |
| AI2-381 | Layland 69 kV | 69 | 35.5 | Solar | Withdrawn |
| AE2-160 | Hawks Nest Hydro | 138 | 30 | Hydro | Engineering and Procurement |
| AG1-194 | Nuttall 138 kV | 138 | 27 | Hybrid | Withdrawn |
| AH2-369 | Nuttall 138 kV | 138 | 16 | Solar | Withdrawn |
| W3-161 | Kanawha River 138kV | 138 | 13 | Other | Withdrawn |
| AH2-368 | Not reported | n/r | 5.5 | Solar | Withdrawn |
| R76 | Hawks Nest Hydro | 138 | 5.5 | Hydro | In Service |
| AE2-159 | Kanawha River 138 kV | 138 | 0 | Hydro | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.