Fayette, WV interconnection queue

4 active projects totalling 153.3 MW in the PJM queue, plus 11 with terminal status (shown greyed).

4active projects
153.3active MW
15total filed
Queue IDProjectkVMWResourceStatus
O57 Kanawha 138kV 138 142 Hydro Withdrawn
C01-1282 Kanawha River - Carbondale 138 kV 138 80 Battery Active
V1-035 ST 138 53 Other Withdrawn
AE2-158 Kanawha River 138 kV 138 48 Hydro Withdrawn
AI2-190 Carbondale 138 kV 138 40.2 Solar Withdrawn
AG1-219 Layland 69 kV 69 39.5 Hybrid Withdrawn
AG2-657 Kanawha River - Carbondale 138 kV 138 37.8 Solar Active
AI2-381 Layland 69 kV 69 35.5 Solar Withdrawn
AE2-160 Hawks Nest Hydro 138 30 Hydro Engineering and Procurement
AG1-194 Nuttall 138 kV 138 27 Hybrid Withdrawn
AH2-369 Nuttall 138 kV 138 16 Solar Withdrawn
W3-161 Kanawha River 138kV 138 13 Other Withdrawn
AH2-368 Not reported n/r 5.5 Solar Withdrawn
R76 Hawks Nest Hydro 138 5.5 Hydro In Service
AE2-159 Kanawha River 138 kV 138 0 Hydro Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.