Homer City 230 kV
PJM queue ID C01-1250
Homer City 230 kV (C01-1250) is listed in the PJM interconnection queue as a 780 MW gas project in Indiana County, PA. The filing names Homer City as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of November 1, 2029.
| Queue ID | C01-1250 |
|---|---|
| Project name | Homer City 230 kV |
| Status (as published) | Active |
| Substation | Homer City |
| Point of interconnection | Homer City 230 kV |
| County | Indiana |
| State | PA |
| Voltage | 230 kV |
| Capacity | 780 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2029-11-01 |
| Source dataset | cycle |
Same substation and county
Homer City substation: 4 requests in the PJM queue, 2 active totaling 2,516 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1097 | Homer City 345 kV | 1,736 | Gas | Active |
| G43 | Homer City | 600 | Gas | Withdrawn |
| G09 | Homer City | 547.5 | Gas | Withdrawn |
Indiana, PA: 33 requests in the PJM queue, 11 active totaling 4,617.6 MW.
A substation with the same name is named in PJM transmission planning materials: Homer City (PENELEC, 3 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Homer City Generation, L.P. |
|---|---|
| Transmission owner | PENELEC |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 780.0 |
| MW capacity | 780.0 |
| MFO | 1400.0 |
| Submitted date | 3/24/2026 |
| Last updated | 6/10/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.