Highland substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
AC2-019 Highland 12kV 12 3.8 Solar Withdrawn
AC2-028 Highland 13.2kV 13.2 3.8 Solar Withdrawn
V1-032 Highland 69kV 69 1.9 Solar Withdrawn
AC2-027 Highland 12kV 12 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.