Substation Scout

Hillsboro-Wildcat substation interconnection queue

1 active project totalling 57 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
57active MW
2total filed
Queue IDProjectkVMWResourceStatus
AI2-447 Hillsboro-Wildcat 138kV 138 87.3 Solar Withdrawn
AC1-089 Willowbrook Solar 138 57 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.