Substation Scout

Pierce - Kyger Creek substation interconnection queue

1 active project totalling 200 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
200active MW
4total filed
Queue IDProjectkVMWResourceStatus
C01-1343 Pierce - Kyger Creek 345 kV 345 200 Battery Active
AI2-085 Pierce - Kyger Creek 345 kV 345 65 Solar Withdrawn
AH1-404 Pierce - Kyger Creek 345 kV 345 24 Solar Withdrawn
AH1-537 Pierce - Kyger Creek 345 kV 345 17.9 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.