Pierce - Kyger Creek substation interconnection queue
1 active project totaling 200 MW in the PJM queue, plus 3 with terminal status (shown grayed).
4 PJM queue filings name Pierce - Kyger Creek as the point of interconnection, all in Highland County, OH.
Target commercial operation dates as filed run from Dec 2024 to Jun 2031 (4 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: OVEC (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1343 | Pierce - Kyger Creek 345 kV | 345 | 200 | Battery | Active | Jun 2031 |
| AI2-085 | Pierce - Kyger Creek 345 kV | 345 | 65 | Solar | Withdrawn | Dec 2025 |
| AH1-404 | Pierce - Kyger Creek 345 kV | 345 | 24 | Solar | Withdrawn | Dec 2024 |
| AH1-537 | Pierce - Kyger Creek 345 kV | 345 | 17.9 | Solar | Withdrawn | Mar 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-05 | AH1-537 | Terminal status | 17.9 | Active → Withdrawn |
Other PJM queue substations in Highland County, OH
- Stuart-Clinton: 3 active, 290 MW of 3 filed
- Clinton-Stuart: 1 active, 180 MW of 4 filed
- Hillsboro-Middleboro: 2 active, 110.7 MW of 2 filed
- Buckskin: 2 active, 77.2 MW of 10 filed
- Hillsboro-Wildcat: 1 active, 57 MW of 2 filed
- Hillsboro: none active of 10 filed
- Highland: none active of 4 filed
- Buckskin – Worley: none active of 2 filed
- Hillsboro-Millbrook: none active of 2 filed
- Stuart - Clinton: none active of 2 filed
- Wildcat: none active of 2 filed