Stuart - Clinton substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-2215 Stuart - Clinton 345 kV 345 136.6 Solar Withdrawn
C01-2219 Stuart - Clinton 345 kV 345 47.1 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.