Substation Scout

Hardin Energy Center – Phase 3

PJM queue ID AD2-086

Hardin Energy Center – Phase 3 (AD2-086) is listed in the PJM interconnection queue as a 138 MW solar project in Hardin County, OH. The filing names Hardin Switch as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2025.

Queue IDAD2-086
Project nameHardin Energy Center – Phase 3
Status (as published)In Service
SubstationHardin Switch
Point of interconnectionHardin Switch 345 kV
CountyHardin
StateOH
Voltage345 kV
Capacity138 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2025-12-31
Source datasetserial

Same substation and county

Hardin Switch substation: 9 requests in the PJM queue, 7 active totaling 409.9 MW.

Queue IDProjectMWResourceStatus
AD1-130Hardin Energy Center – Phase 2101.5SolarIn Service
C01-1653Hardin Switch 345 kV67.2SolarActive
AE2-216Hardin Energy Center – Storage II55BatterySuspended
C01-1652Hardin Switch 345 kV27.8SolarActive
AE1-090Hardin Energy Center - Phase 312SolarIn Service
AH1-327Hardin Switch 345 kV8.4SolarActive
AI2-149Hardin Switch 345 kV67.2SolarWithdrawn
AI2-181Hardin Switch 345 kV27.8SolarWithdrawn

Hardin, OH: 39 requests in the PJM queue, 18 active totaling 715 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy230
MW capacity138
MFO230

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.