Substation Scout

Alton Post Office Solar

PJM queue ID AD1-058

Alton Post Office Solar (AD1-058) is listed in the PJM interconnection queue as a 36.6 MW solar project in Halifax County, VA. The filing names Halifax-Person as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2024.

Queue IDAD1-058
Project nameAlton Post Office Solar
Status (as published)In Service
SubstationHalifax-Person
Point of interconnectionHalifax-Person 230 kV
CountyHalifax
StateVA
Voltage230 kV
Capacity36.6 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2024-12-31
Source datasetserial

Same substation and county

Halifax-Person substation: 3 requests in the PJM queue, 3 active totaling 84.8 MW.

Queue IDProjectMWResourceStatus
AC2-100Powells Creek Solar33.6SolarIn Service
AC1-221Alton Post Office Solar14.6SolarIn Service

Halifax, VA: 57 requests in the PJM queue, 25 active totaling 1,315.8 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy45.9
MW capacity36.6
MFO75.1

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first