Grandview-Clifftop substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Grandview-Clifftop as the point of interconnection, all in Raliegh County, WV.

Target commercial operation dates as filed run from Dec 2021 to Jun 2025 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AE1-212 Raleigh Solar Project 138 53.3 Solar Withdrawn Jun 2025
AG1-089 Grandview-Clifftop 138 kV 138 12 Battery Withdrawn Dec 2021

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-10-19AE1-212Status changen/a Pending Termination → Withdrawn

Other PJM queue substations in Raliegh County, WV

All 3 PJM queue filings in Raliegh County, WV.