Clermont Solar
PJM queue ID AE2-113
Clermont Solar (AE2-113) is listed in the PJM interconnection queue as a 61.9 MW solar project in McKean County, PA. The filing names Farmers Valley-Ridgeway as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of August 10, 2026.
| Queue ID | AE2-113 |
|---|---|
| Project name | Clermont Solar |
| Status (as published) | Under Construction |
| Substation | Farmers Valley-Ridgeway |
| Point of interconnection | Farmers Valley-Ridgeway 115 kV |
| County | McKean |
| State | PA |
| Voltage | 115 kV |
| Capacity | 61.9 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2026-08-10 |
| Source dataset | serial |
Same substation and county
Farmers Valley-Ridgeway substation: 2 requests in the PJM queue, 1 active totaling 61.9 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF2-052 | Farmers Valley-Ridgeway 115 kV | 37 | Solar | Withdrawn |
McKean, PA: 21 requests in the PJM queue, 1 active totaling 61.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 120 |
| MW capacity | 61.9 |
| MFO | 120 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.