Clermont Solar (AE2-113) is listed in the PJM interconnection queue as a 61.9 MW solar project in McKean County, PA. The filing names Farmers Valley-Ridgeway as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of August 10, 2026.

Queue IDAE2-113
Project nameClermont Solar
Status (as published)Under Construction
SubstationFarmers Valley-Ridgeway
Point of interconnectionFarmers Valley-Ridgeway 115 kV
CountyMcKean
StatePA
Voltage115 kV
Capacity61.9 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2026-08-10
Source datasetserial

Same substation and county

Farmers Valley-Ridgeway substation: 2 requests in the PJM queue, 1 active totaling 61.9 MW.

Queue IDProjectMWResourceStatus
AF2-052Farmers Valley-Ridgeway 115 kV37SolarWithdrawn

McKean, PA: 21 requests in the PJM queue, 1 active totaling 61.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy120
MW capacity61.9
MFO120

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first