Substation Scout

Kumquat Solar

PJM queue ID AF2-250

Kumquat Solar (AF2-250) is listed in the PJM interconnection queue as a 1.1 MW solar project in Wicomico County, MD. The filing names Edgewood III as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of July 31, 2022.

Queue IDAF2-250
Project nameKumquat Solar
Status (as published)In Service
SubstationEdgewood III
Point of interconnectionEdgewood 12 kV III
CountyWicomico
StateMD
Voltage12 kV
Capacity1.1 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2022-07-31
Source datasetserial

Same substation and county

Edgewood III substation: 2 requests in the PJM queue, 1 active totaling 1.1 MW.

Queue IDProjectMWResourceStatus
AH2-071Edgewood 12.47 kV III0SolarWithdrawn

Wicomico, MD: 34 requests in the PJM queue, 6 active totaling 149 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy1.95
MW capacity1.1
MFO1.95

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first